EASA PART-145 · BG.145.4044   AOG 24/7 · aog@ptm.aero

In development

Base maintenance from late 2027.

Three narrow-body lines at the future Flight Eco Center, Olsztyn-Mazury Airport (SZY), Poland.

The project

A hangar built for narrow-body throughput.

Through the group entity Poente Base Maintenance, we are the designated operator of the future Flight Eco Center at Olsztyn-Mazury Airport. The cooperation agreement with the airport operator was signed in 2025, and partnerships with regional schools and universities are in place to build the future workforce.

The facility is planned for three narrow-body lines, matching the group's line maintenance focus on the Airbus A320 family and the Boeing 737.

Flight Eco Center, Olsztyn-Mazury Airport, visualization

Flight Eco Center · Olsztyn-Mazury (SZY) · visualization

Why reserve early

Secure capacity before the hangar opens.

Operators building their 2027 and 2028 maintenance plans can secure capacity and shape the cooperation before the first aircraft arrives.

Location · Olsztyn-Mazury (SZY), Poland
Capacity · 3 narrow-body lines
Operational · from late 2027
Agreement · signed with airport operator, 2025
Contact · sales@ptm.aero